Software for planning, execution, material management, and project controls on generation outages, where the window is fixed and every hour carries revenue.

What makes a generation outage different

An outage window is usually fixed before the work is fully scoped. The unit comes offline on a date set by grid commitments and comes back on a date that is not negotiable. Everything else bends around that.

The planned power plant outage management guide covers scope, work packages, parts and return-to-service planning against a fixed window.

The cost of delay is measured in hours

Lost generation revenue accrues by the hour, not the day. That compresses every decision cycle and makes a daily cost picture the minimum useful cadence.

Long-lead components dominate the risk

Turbine components, generator parts, and heat exchanger elements carry lead times measured in months and sometimes in quarters. A single mis-located component can consume the float in an entire outage window.

See material tracking from requisition to installation for the item records and readiness checks that connect long-lead parts to their required dates.

Documentation is a deliverable, not overhead

Regulatory and reliability documentation has to be produced as work happens. Reconstructing it after the fact is expensive and, in some cases, not acceptable.

Where events break down here

The failure modes are specific to this sector.

01 / Window

Fixed dates, incomplete scope

The window is set before the work is fully known, so scope discovery lands against a deadline that cannot move.

02 / Long-lead

One component can consume the float

Turbine and generator components with quarter-long lead times, and no room to reorder.

03 / Documentation

Records reconstructed after the fact

Documentation produced at close-out rather than as work happens.

How EZTRAK addresses it

Three modules. One connected platform.

Module 01

Pilot — Planning & Execution

Manage scope, work packages, sequencing, readiness, and daily field progress in one system.

Explore Pilot →

eztrak / pilot / overview
EZTRAK Pilot planning and execution dashboard
Module 02

Flow — Material Management

Track material from requisition and purchase order through receipt, staging, issuing, and installation.

Explore Flow →

eztrak / flow / overview
EZTRAK Flow material management dashboard
Module 03

Vault — Cost Tracking

Manage estimating, bids, budgets, cost and manpower reporting, forecasting, and scope changes.

Explore Vault →

eztrak / vault / overview
EZTRAK Vault cost tracking dashboard
Systems we connect to

We work alongside what you already run.

Maximo

Notifications, work orders, and equipment history.

Primavera P6

Outage schedule, activity dates, and critical path.

SAP

Purchase orders, invoices, and vendor master data where SAP is in use.

Common questions

Frequently asked questions

Comparing software options? See the turnaround software comparison.

Does this handle regulatory documentation?

Work packages carry procedures, permits, photographs, and completion records as the work happens, so the documentation is produced during the outage rather than reassembled after it.

Can it track long-lead components specifically?

Yes. Long-lead items are tracked from requisition through receipt and yard location, with shortages mapped onto the P6 schedule activities they threaten.

Does it work for both planned and forced outages?

The product is built for planned outages. Forced outage scope can be added to an existing event, but the planning workflow assumes a planned window.

How does it fit with our existing outage schedule?

P6 stays authoritative. EZTRAK reads activity dates and reports material and cost against them.

Can we start with one module?

Yes. Most clients start with one and add the others after it has been through an outage.

Join our weekly newsletter

Field-level insights into how turnarounds, shutdowns, and outages actually run. No product announcements.

See what your next
turnaround could save.

Answer six quick questions and get a conservative savings estimate based on real turnaround cost drivers.

6 questions under 2 minutes

Turnaround ROI CalculatorGet a conservative estimate in minutes.
3 of 6 questions
Typical savings$2.5M+

Based on industry benchmarks and real turnaround cost drivers.

Continue to full estimate