Answer six quick questions and receive a conservative savings estimate based on results from live refinery turnarounds—including material waste, planning labor, cost control, bidding, and internal IT effort.
See what your turnarounds could save.
Under two minutes — just a defensible number you can bring to your team. We use deliberately conservative figures based on live turnaround results.
100% free~2 minutesNo signup
Question 1 of 6
What do you want to estimate?
Pick whichever fits how you plan to use the number.
Question 2 of 6
How large is the turnaround?
Total budgeted spend for the event. Drag to your number.
$40Mevent budget
$1M$100M
Question 2b of 6
How many locations?
Estimate one site, or enter a higher number to project across multiple locations. Per-site savings and the estimate scale with this.
Question 3 of 6
How efficient is your material spend today?
Material waste isn't just theft — it's duplicate orders, surplus, misplaced items, rush orders, and extra freight. Materials are typically 30–40% of turnaround spend.
Question 4 of 6
How many contract planners for the event?
Outside planners/schedulers hired for the turnaround. (Salaried in-house planners aren't counted.)
Question 5 of 6
What does your current turnaround software cover?
Select every function a dedicated tool already handles for you. Anything left unchecked is likely still run on spreadsheets. (We only credit savings where you don't already have a tool.)
Question 6 of 6
Do you carry any of this IT load?
Select all that apply — these are costs we typically absorb.
Materials as % of spend 35%
Waste reduced down to 2%
Take your estimate with you.
Enter your work email to download a PDF copy. Your results are already available below.
Estimated conservative savings
$0
The upside we don't put a number on — but you'll feel most
Real-time data. Every player works from the same live picture — material, job status, cost, and headcount update the moment they change, not a day later. Decisions get made on what's true right now.
Predictability. No sandbagged jobs surfacing at the end or surprise backlogs at the finish line. QA and leadership pace resources against reality, so the schedule holds.
More time on tools. When material is staged and ready and crews aren't waiting on handoffs or sign-offs, wrench time goes up. Even a fraction more across hundreds of jobs is enormous.
✓ Your estimate is ready
See these numbers on your turnaround
This is a conservative estimate built on ranges. A 30-minute demo shows exactly how each line lands on your actual scope — using your numbers, not our averages.
Estimates are illustrative and intentionally conservative, based on EZTRAK's observed results across live refinery turnarounds. Actual savings vary by facility, scope, and current processes.
Join our weekly newsletter
Field-level insights into how turnarounds, shutdowns, and outages actually run. No product announcements.